Module LBNL results


The module name column is highlighted in GREEN once the component has succesfully reached BNL

Modules with stage BONDED are ready for thermal cycling:

Based on the stage FINISHED, the following 0 modules are ready to ship:

The box colours reflect the test status.

As an extra check, the following text may be present in the boxes if the local test results are not consistent with the results from the database:

Module Stage Flags Post HV-tab IV Gluing Metrology Wirebonding TC Electrical Shipped Comment
LBNL_PS_LS_67 LIMBO ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY    
LBNL_PS_LS_335 LIMBO ✓ DB ONLY     ✓ DB ONLY LBNL_STRIP_MODULES  
LBNL_PS_LS_327 LIMBO ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY LBNL_STRIP_MODULES  
LBNL_PS_LS_251 FAILED ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY LBNL_STRIP_MODULES  
LBNL_PS_LS_205 BONDED ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY    
LBNL_PS_LS_186 FINISHED Grade B ✓ DB ONLY     ✓ DB ONLY BNL This module was shipped to us with stuck charges. We UV cured it for 1 hour, and now it passes. - Marcus Wong, 22.10.2025--20-42-37
LBNL_PS_LS_180 FINISHED ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY BNL This module was shipped to us with stuck charges. We UV cured it for 3 hours, and now it passes. - Marcus Wong, 22.10.2025--20-41-35
LBNL_PROD_LS_376 TESTED ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY    
LBNL_PROD_LS_371 LIMBO ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY LBNL_STRIP_MODULES  
LBNL_PROD_LS_370 LIMBO ✓ DB ONLY   ✓ DB ONLY ✓ DB ONLY LBNL_STRIP_MODULES  
LBNL_PPC_LS_59 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING RAL  
LBNL_PPC_LS_58 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING RAL  
LBNL_PPC_LS_57 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL  
LBNL_PPC_LS_56 FINISHED ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL  
LBNL_PPC_LS_55 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL  
LBNL_PPC_LS_54 FINISHED ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL  
LBNL_PPC_LS_52 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL  
LBNL_PPC_LS_51 ON_CORE ✓ DB ONLY     ✓ DB ONLY ! DB MISSING BNL