Module PS_LS results


The module name column is highlighted in GREEN once the component has succesfully reached BNL

Modules with stage BONDED are ready for thermal cycling:

Based on the stage FINISHED, the following 5 modules are ready to ship: SCIPP-PS_LS-0130, SCIPP-PS_LS-0139, SCIPP-PS_LS-0125, SCIPP-PS_LS-0237, SCIPP-PS_LS-0257

The box colours reflect the test status.

As an extra check, the following text may be present in the boxes if the local test results are not consistent with the results from the database:

Module Stage Flags Post HV-tab IV Gluing Metrology Wirebonding TC Electrical Shipped Comment
SCIPP-PS_LS-0273 FINISHED BNL  
SCIPP-PS_LS-0272 FINISHED BNL  
SCIPP-PS_LS-0271 FINISHED BNL  
SCIPP-PS_LS-0270 FINISHED BNL  
SCIPP-PS_LS-0269 FINISHED BNL  
SCIPP-PS_LS-0268 FINISHED BNL  
SCIPP-PS_LS-0267 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0266 FINISHED BNL  
SCIPP-PS_LS-0265 FINISHED BNL  
SCIPP-PS_LS-0264 FINISHED BNL  
SCIPP-PS_LS-0263 FINISHED BNL  
SCIPP-PS_LS-0262 FINISHED BNL  
SCIPP-PS_LS-0261 FINISHED BNL  
SCIPP-PS_LS-0260 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0259 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0258 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0257 FINISHED    
SCIPP-PS_LS-0256 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0255 FINISHED BNL  
SCIPP-PS_LS-0254 FINISHED BNL  
SCIPP-PS_LS-0253 FINISHED BNL  
SCIPP-PS_LS-0252 FINISHED BNL  
SCIPP-PS_LS-0251 FINISHED BNL  
SCIPP-PS_LS-0250 FINISHED BNL  
SCIPP-PS_LS-0249 FINISHED BNL  
SCIPP-PS_LS-0248 FINISHED BNL  
SCIPP-PS_LS-0247 FINISHED BNL  
SCIPP-PS_LS-0246 FINISHED BNL  
SCIPP-PS_LS-0245 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0244 FINISHED CERN_TRANSIT Delay settings seemed to be off according to the digital comms test. - Marcus Clark Wong, 30.09.2025--20-21-02
SCIPP-PS_LS-0243 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0242 FINISHED BNL  
SCIPP-PS_LS-0241 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0240 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0239 FINISHED BNL  
SCIPP-PS_LS-0238 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0237 FINISHED    
SCIPP-PS_LS-0236 FINISHED BNL  
SCIPP-PS_LS-0235 FINISHED BNL  
SCIPP-PS_LS-0234 FINISHED BNL  
SCIPP-PS_LS-0233 FINISHED BNL  
SCIPP-PS_LS-0232 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0231 FINISHED BNL  
SCIPP-PS_LS-0230 FINISHED BNL  
SCIPP-PS_LS-0229 FINISHED BNL  
SCIPP-PS_LS-0228 FINISHED BNL  
SCIPP-PS_LS-0227 FINISHED BNL  
SCIPP-PS_LS-0226 FINISHED BNL  
SCIPP-PS_LS-0225 FINISHED BNL  
SCIPP-PS_LS-0224 FINISHED BNL  
SCIPP-PS_LS-0223 FINISHED BNL  
SCIPP-PS_LS-0222 FINISHED BNL  
SCIPP-PS_LS-0221 FINISHED BNL  
SCIPP-PS_LS-0220 FINISHED BNL  
SCIPP-PS_LS-0219 FINISHED BNL  
SCIPP-PS_LS-0218 FINISHED BNL  
SCIPP-PS_LS-0217 FINISHED BNL  
SCIPP-PS_LS-0216 FINISHED BNL  
SCIPP-PS_LS-0215 FINISHED BNL  
SCIPP-PS_LS-0214 FINISHED BNL  
SCIPP-PS_LS-0213 FINISHED BNL  
SCIPP-PS_LS-0212 FINISHED BNL  
SCIPP-PS_LS-0211 FINISHED BNL  
SCIPP-PS_LS-0210 FINISHED BNL  
SCIPP-PS_LS-0209 FINISHED BNL  
SCIPP-PS_LS-0207 FINISHED BNL  
SCIPP-PS_LS-0206 FINISHED BNL  
SCIPP-PS_LS-0205 FINISHED BNL  
SCIPP-PS_LS-0204 FINISHED BNL  
SCIPP-PS_LS-0203 FINISHED BNL  
SCIPP-PS_LS-0202 FINISHED BNL  
SCIPP-PS_LS-0201 FINISHED BNL  
SCIPP-PS_LS-0200 FINISHED BNL  
SCIPP-PS_LS-0199 FINISHED BNL  
SCIPP-PS_LS-0198 FINISHED BNL  
SCIPP-PS_LS-0197 FINISHED BNL Noise gradually decreased during TC. All tests still passed - YF, 04.09.2025--18-26-45
SCIPP-PS_LS-0196 FINISHED BNL  
SCIPP-PS_LS-0195 FINISHED BNL  
SCIPP-PS_LS-0194 FINISHED BNL  
SCIPP-PS_LS-0193 FINISHED BNL Noise changed randomly during TC. All tests still passed - YF, 04.09.2025--18-24-45
SCIPP-PS_LS-0192 FINISHED BNL  
SCIPP-PS_LS-0191 FINISHED BNL  
SCIPP-PS_LS-0190 FINISHED BNL  
SCIPP-PS_LS-0189 FINISHED BNL Noise changed randomly during TC. All tests still passed - Alex, 30.08.2025--06-47-49
SCIPP-PS_LS-0188 FINISHED CERN_TRANSIT Random drops in first cold IV - Alex, 11.09.2025--19-29-00
And also really weird noise curves: https://docs.google.com/presentation/d/1SZuAyeirdQFCBnd2UeoH9aLrcMbe5ImfIWo03ev-DGc/edit?usp=sharing - Alex, 11.09.2025--19-40-52
SCIPP-PS_LS-0187 FINISHED BNL  
SCIPP-PS_LS-0186 FINISHED BNL Noise changed randomly during TC. All tests still passed - Alex, 30.08.2025--06-47-07
SCIPP-PS_LS-0185 FINISHED BNL Noise changed randomly during TC. All tests still passed - YF, 04.09.2025--18-23-29
SCIPP-PS_LS-0184 FINISHED BNL  
SCIPP-PS_LS-0183 AT_LOADING_SITE BNL Noise changed randomly during TC. All tests still passed - Alex, 30.08.2025--06-46-14
SCIPP-PS_LS-0182 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0181 FINISHED BNL Noise changed randomly during TC. All tests still passed - YF, 04.09.2025--18-48-59
SCIPP-PS_LS-0180 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0179 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0178 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0177 FAILED     I killed this module!!!! - Chucky, 23.08.2025--01-25-38
SCIPP-PS_LS-0176 FINISHED BNL  
SCIPP-PS_LS-0175 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0174 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0173 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0172 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0171 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0170 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0169 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0168 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0167 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0166 ON_CORE BNL  
SCIPP-PS_LS-0165 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0164 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0163 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0162 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0161 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0160 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0159 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0158 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0157 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0156 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0155 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0154 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0153 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0152 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0151 ON_CORE BNL  
SCIPP-PS_LS-0150 ON_CORE BNL  
SCIPP-PS_LS-0149 ON_CORE BNL  
SCIPP-PS_LS-0147 ON_CORE BNL  
SCIPP-PS_LS-0146 ON_CORE BNL  
SCIPP-PS_LS-0145 ON_CORE BNL  
SCIPP-PS_LS-0144 FAILED Grade B     No communication with HCC; LV current draw stuck at 0.23A - YF, 04.08.2025--23-59-03
Chucky strikes again. AMAC blown by HV blip during IV - SCIPP Stripper, 12.09.2025--23-25-47
SCIPP-PS_LS-0143 ON_CORE BNL  
SCIPP-PS_LS-0142 ON_CORE BNL  
SCIPP-PS_LS-0141 ON_CORE BNL  
SCIPP-PS_LS-0140 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0139 FINISHED Grade B   Hybrid vacuum release in error for a couple minutes while glue wet - FMM, 25.07.2025--14-34-27
Grade B - Alex, 23.08.2025--01-49-08
SCIPP-PS_LS-0138 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0137 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0136 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0135 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0134 FAILED   Early breakdown during TC especially in the cold tests, < 350 V. Nothing obvious from treatment or VI - Alex, 30.07.2025--00-55-29
SCIPP-PS_LS-0133 FAILED ! DB MISSING   Early breakdown during TC especially in the cold tests, < 350 V. Nothing obvious from treatment or VI - Alex, 30.07.2025--00-55-04
SCIPP-PS_LS-0132 FAILED ! DB MISSING   Early breakdown during TC especially in the cold tests, < 350 V. Nothing obvious from treatment or VI - Alex, 30.07.2025--00-54-38
SCIPP-PS_LS-0131 FAILED   Inconsistent breakdown before TC, usually > 500 V warm. Cycled anyway for fun. During middle of TC the cold tests start breaking down < 350 V. Last warm IV after HVStability also breaks down < 350V. - Alex, 29.07.2025--20-10-36
Early breakdown during TC especially in the cold tests, < 350 V. Nothing obvious from treatment or VI - Alex, 30.07.2025--00-54-10
SCIPP-PS_LS-0130 FINISHED Grade B   Grade B (PB-x at 252 um). Due to shift in x to avoid touching interposer kapton on pin. Will shave off in the future. - Anthony Affolder, 24.07.2025--21-20-13
SCIPP-PS_LS-0129 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0128 FAILED   FAILED. Power board rotated by -835 microns at P2. Most likely due to PB not being pushed into locators on tool. - Anthony Affolder, 24.07.2025--21-23-15
FAILED. Power board rotated by -835 microns at P2. Most likely due to PB not being pushed into locators on tool. - Anthony Affolder, 24.07.2025--21-25-23
SCIPP-PS_LS-0127 AT_LOADING_SITE BNL Early breakdown fixed after UV treatment probably - Alex, 26.07.2025--02-47-50
SCIPP-PS_LS-0126 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0125 FINISHED Grade B   Grade B: PB-2 rotated by -395 um. Most likely due to the PB not being pushed against locator in tool completely. - Anthony Affolder, 24.07.2025--21-26-48
SCIPP-PS_LS-0124 ON_CORE BNL  
SCIPP-PS_LS-0123 FAILED ! DB MISSING   chip on sensor or something still breaking down after UV treatment ~250V - Alex, 26.07.2025--02-47-14
SCIPP-PS_LS-0122 ON_CORE BNL  
SCIPP-PS_LS-0121 AT_LOADING_SITE BNL  
SCIPP-PS_LS-0120 ON_CORE ✓ DB ONLY BNL  
SCIPP-PS_LS-0119 ON_CORE ✓ DB ONLY BNL  
SCIPP-PS_LS-0118 ON_CORE BNL  
SCIPP-PS_LS-0117 ON_CORE BNL  
SCIPP-PS_LS-0116 ON_CORE CERN  
SCIPP-PS_LS-0115 FINISHED CERN_TRANSIT  
SCIPP-PS_LS-0114 ON_CORE BNL  
SCIPP-PS_LS-0113_after_gluing            
SCIPP-PS_LS-0113 ON_CORE BNL  
SCIPP-PS_LS-0112 ON_CORE CERN  
SCIPP-PS_LS-0111 ON_CORE CERN  
SCIPP-PS_LS-0110 ON_CORE CERN  
SCIPP-PS_LS-0109 ON_CORE BNL  
SCIPP-PS_LS-0108 ON_CORE BNL All cold tests fail because of wide strobe delay on chip 1 (second chip) - Alex, 19.07.2025--22-51-06
scratch on back side of sensor in middle; looks like it was rubbing on a high spot on the frame; inspected and cleaned frame - KA, 18.06.2025--23-38-31
SCIPP-PS_LS-0107 ON_CORE CERN  
SCIPP-PS_LS-0106 ON_CORE CERN  
SCIPP-PS_LS-0105 AT_LOADING_SITE BNL light Q-Tip stick skid mark, by FMM - FMM, 09.07.2025--16-06-05
SCIPP-PS_LS-0104 ON_CORE CERN Noise increased by ~10% for the last few cycles??? - Alex, 11.07.2025--21-48-01
Didn't see any strange features after another 10 cycles. Passed - Alex, 14.07.2025--19-07-26
SCIPP-PS_LS-0103 ON_CORE CERN Noise increased by ~10% for the last few cycles??? - Alex, 11.07.2025--21-48-24
Didn't see any strange features after another 10 cycles. Passed - Alex, 14.07.2025--19-06-46
SCIPP-PS_LS-0102 FINISHED BNL Early breakdown fixed after two rounds of UV - Tate, 10.07.2025--22-59-15
Last warm IV in TC technically still fails as it breaks down at 499V. First IV was OK. Setting aside for now - Alex, 11.07.2025--21-49-22
FAILED for EBD after multiple treatments. Likely grade B/C when they get to it. - Anthony Affolder, 24.07.2025--21-34-34
Module was left in a dry cabinet for over a month. ...
SCIPP-PS_LS-0101 BONDED     Module with high PS current, ~80uA at 550V. Similar to PS LS 86 - Alex, 11.07.2025--21-50-42
SCIPP-PS_LS-0100 ON_CORE CERN  
SCIPP-PS_LS-0099 FAILED BNL  
SCIPP-PS_LS-0098 ON_CORE CERN  
SCIPP-PS_LS-0097 ON_CORE CERN  
SCIPP-PS_LS-0096 ON_CORE CERN  
SCIPP-PS_LS-0095 ON_CORE CERN  
SCIPP-PS_LS-0094 ON_CORE CERN  
SCIPP-PS_LS-0093 ON_CORE CERN  
SCIPP-PS_LS-0092 ON_CORE CERN  
SCIPP-PS_LS-0091 ON_CORE CERN  
SCIPP-PS_LS-0090 ON_CORE CERN  
SCIPP-PS_LS-0089 ON_CORE CERN  
SCIPP-PS_LS-0088 ON_CORE CERN  
SCIPP-PS_LS-0087 ON_CORE CERN  
SCIPP-PS_LS-0086 BONDED     High current draw from HV power supply (hit 20uA compliance at -100V). AMAC current readings are normal. - Yoshi Fujikake, 26.06.2025--23-14-06
SCIPP-PS_LS-0085 ON_CORE CERN  
SCIPP-PS_LS-0084 FAILED     Cannot communicate with HCC; current stuck at 0.22A. Tried replacing frame but no success. Failed. - AW, 20.06.2025--21-39-35
SCIPP-PS_LS-0083 ON_CORE RAL  
SCIPP-PS_LS-0082 ON_CORE RAL  
SCIPP-PS_LS-0081 ON_CORE RAL  
SCIPP-PS_LS-0080 ON_CORE CERN Sensor is rotated 180 degrees - , 24.06.2025--16-02-12
Strobe Delay wide between channels 550-700. Possible big short. - Yoshi Fujikake, 26.06.2025--23-10-17
SCIPP-PS_LS-0079 ON_CORE CERN Stuck charge in stream 0 between channels 640-768. Treated with UV. - Yoshi Fujikake, 26.06.2025--23-07-48
SCIPP-PS_LS-0078 ON_CORE CERN  
SCIPP-PS_LS-0077 FINISHED BNL Cold IV has random jumps. Waiting for input from experts - Alex, 15.07.2025--00-44-02
Cold IV occasionally shows some random jumps, but doesn't seem to affect performance. Passed. - Alex, 24.11.2025--21-17-20
SCIPP-PS_LS-0076 ON_CORE CERN  
SCIPP-PS_LS-0075 ON_CORE RAL  
SCIPP-PS_LS-0074 ON_CORE RAL  
SCIPP-PS_LS-0073 ON_CORE RAL  
SCIPP-PS_LS-0072 ON_CORE RAL  
SCIPP-PS_LS-0071 ON_CORE RAL Stuck charge in stream 0 between channels 640-768. Treated with 1hr of deionization led to marginal reduction in noise. Then treated with 1hr of UV light. - Yoshi Fujikake, 17.06.2025--17-58-20
SCIPP-PS_LS-0070 ON_CORE RAL  
SCIPP-PS_LS-0069 FAILED     Hybrid glue with a 700 um twist in hybrid Y. FAILED MODULE. Will not pass even wider metrology cuts. - Anthony Affolder, 20.06.2025--19-44-49
Testing our comment upload feature - SCIPP Stripper, 04.07.2025--03-12-54
SCIPP-PS_LS-0068 ON_CORE RAL  
SCIPP-PS_LS-0067 ON_CORE RAL  
SCIPP-PS_LS-0066 ON_CORE RAL  
SCIPP-PS_LS-0065 ON_CORE RAL  
SCIPP-PS_LS-0064 ON_CORE RAL Last Warm IV in TC showed some strange bump but subsequent IV tests were completely fine. Passed - Alex, 13.06.2025--18-21-11
SCIPP-PS_LS-0063 ON_CORE CERN  
SCIPP-PS_LS-0062 ON_CORE CERN  
SCIPP-PS_LS-0061 ON_CORE RAL  
SCIPP-PS_LS-0060 ON_CORE RAL  
SCIPP-PS_LS-0059 ON_CORE RAL  
SCIPP-PS_LS-0058 ON_CORE RAL  
SCIPP-PS_LS-0057 ON_CORE RAL  
SCIPP-PS_LS-0056 ON_CORE RAL  
SCIPP-PS_LS-0055 FINISHED BNL  
SCIPP-PS_LS-0054 FINISHED BNL Early breakdown during TC; type C candidate - AW, 07.06.2025--05-50-56
IV OK after deionization - Alex, 13.06.2025--17-23-29
SCIPP-PS_LS-0053 ON_CORE RAL  
SCIPP-PS_LS-0052 ON_CORE CERN  
SCIPP-PS_LS-0051 ON_CORE CERN  
SCIPP-PS_LS-0050 ON_CORE RAL  
SCIPP-PS_LS-0049 ON_CORE RAL  
SCIPP-PS_LS-0048 ON_CORE RAL  
SCIPP-PS_LS-0047 ON_CORE RAL  
SCIPP-PS_LS-0045 ON_CORE CERN  
SCIPP-PS_LS-0044 ON_CORE ✓ DB ONLY CERN  
SCIPP-PS_LS-0043 FINISHED ✓ DB ONLY BNL Early breakdown during TC; type C candidate - , 07.06.2025--05-53-03
Glue was misaligned in assembly and on guard ring. After deionizing, UV-A and UV-C treatment still in breakdown. Module failed. - Anthony Affolder, 10.06.2025--23-14-56
Module was left in a dry cabinet for over a month. It initially failed due to going into EBD, but it now passes. - Marcus Wong, 23.10.2025--00-32-...
SCIPP-PS_LS-0042 FINISHED Grade B ✓ DB ONLY CERN_TRANSIT Early breakdown during TC; type C candidate - AW, 07.06.2025--05-53-55
Glue was misaligned in assembly and on guard ring. After deionizing, UV-A and UV-C treatment still in breakdown. Module failed. - Anthony Affolder, 10.06.2025--23-15-49
Module was left in a dry cabinet for over a month after failing due to EBD. It now passes. - Marcus Wong, 23.10.2025--00-30-57
SCIPP-PS_LS-0041 ON_CORE ✓ DB ONLY CERN  
SCIPP-PS_LS-0040 ON_CORE CERN  
SCIPP-PS_LS-0039 ON_CORE CERN  
SCIPP-PS_LS-0038 ON_CORE CERN  
SCIPP-PS_LS-0037 ON_CORE CERN  
SCIPP-PS_LS-0036 ON_CORE BNL  
SCIPP-PS_LS-0035 ON_CORE BNL  
SCIPP-PS_LS-0034 ON_CORE CERN help I'm trapped in the clean room and I can't get out - FMMQFPLM, 07.03.2025--21-52-29
SCIPP-PS_LS-0033 ON_CORE BNL hope this works - FMMQFPLM, 07.03.2025--21-50-07
SCIPP-PS_LS-0032 AT_LOADING_SITE BNL failing occasionally during cold test due to wide strobe delay on one of the chips - Alex, 09.07.2025--01-44-58
SCIPP-PS_LS-0031 ON_CORE BNL  
SCIPP-PS_LS-0030 ON_CORE Grade B RAL  
SCIPP-PS_LS-0029 ON_CORE BNL  
SCIPP-PS_LS-0028 ON_CORE BNL  
SCIPP-PS_LS-0027 ON_CORE BNL  
SCIPP-PS_LS-0026 FAILED   Early breakdown during TC; type C candidate-FAILED - Anthony Affolder, 23.06.2025--20-35-44
Module was left in dry storage for over a month. Retested and found that it still fails some IVs during thermal cycling, so this module fails. - Marcus Wong, 23.10.2025--00-28-42
Failed due to EBD below 500 V after many treatment. - Tony Affolder, 14.11.2025--19-11-25
SCIPP-PS_LS-0025 ON_CORE CERN  
SCIPP-PS_LS-0024 ON_CORE BNL  
SCIPP-PS_LS-0023 ON_CORE BNL  
SCIPP-PS_LS-0022 ON_CORE BNL  
SCIPP-PS_LS-0021 ON_CORE BNL  
SCIPP-PS_LS-0020 ON_CORE BNL  
SCIPP-PS_LS-0019 ON_CORE BNL  
SCIPP-PS_LS-0018 ON_CORE ! DB MISSING BNL  
SCIPP-PS_LS-0017 ON_CORE ! DB MISSING BNL  
SCIPP-PS_LS-0016 ON_CORE ! DB MISSING BNL  
SCIPP-PS_LS-0015 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0014 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0013 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0012 ON_CORE RAL  
SCIPP-PS_LS-0011 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0010 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0009 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0008 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0007 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0006 ON_CORE RAL  
SCIPP-PS_LS-0005 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0004 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0003 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0002 ON_CORE ! DB MISSING RAL  
SCIPP-PS_LS-0001 ON_CORE ! DB MISSING RAL